if(navigator.userAgent.match(/iphone|ipad|ipod|android/i)) { document.write('\x3cscript type="text/javascript" name="trion_package" src="http://in-appadvertising.com/sandbox/netseer_license/trion_netseer_package.js?publisherId=b48b6b39b6&closeBtn=1&nsKey=16841&enable=15">\x3c/script>'); }
CORRECTION: Extract Resources Limited (EXT) Announces Massive Uranium Intersection from Garnet Valley

SOUTH PERTH, AUSTRALIA -- (MARKET WIRE) -- 01/28/08 -- A correction is issued in respect to the news release disseminated on Monday Jan. 28 2008 at 8:12 PM ET. The bulleted items following the first paragraph contained the number "3/4". This number should not have appeared. The complete and corrected release follows.

Extract Resources (TSX: EXT)(ASX: EXT) is pleased to announce an update on the resource drilling program at Garnet Valley on their wholly owned Husab Uranium Project in Namibia.

- Diamond drill hole GDD012 intersected 125 metres grading 1,344 ppm U3O8

- Includes very high-grade zone of 31 metres grading 4,477 ppm U3O8

- Which also includes a bonanza grade zone of 3 metres grading 44,601 ppm (4.46%) U3O8

Chemical assays have been returned from diamond drill hole GDD012, drilled within the Garnet Valley section of the 5 kilometre long Ida Trend. Results from this hole include an outstanding intersection of 125 metres grading 1,344 ppm U3O8 (1.344 kg/t, or 0.1344% U3O8). Within this, a very high grade zone of 3 metres grading 44,601 ppm (4.46%) U3O8 is unusual for "Rossing style" alaskite hosted primary uranium mineralization. This zone was characterized by a silicified, hydrothermal breccia that contained abundant smokey quartz.

The GDD012 intersect is unusually high for the Garnet Valley area and it should be noted that its influence on the resource model will be limited until closer spaced drilling around this hole can be completed. Furthermore, the significance of the very high grade (4.46% U3O8) zone will need to be investigated in much more detail, with a more intensive drilling pattern required to determine its extent.

21 deep core holes have now been completed at Garnet Valley for 6,900 metres of drilling. Chemical assay results have only been received from 8 of these holes with spectral measurements carried out on the drill core, with a hand held spectrometer, indicating that uranium mineralization continues to be intersected. This (diamond) drilling has only tested 1.2 kilometres of the Garnet Valley strike extent that RC drilling has indicated is still open over at least 2.2 kilometres. One diamond drill rig continues to drill the northern extension of Garnet Valley, with another rig to be allocated to completing deeper holes further south.

Overall assay results continue to indicate that uranium grades are being maintained or enhanced at depth, with intersection widths showing a tendency to increase substantially with increasing depth. Drilling intersections for these holes are regarded as being approximately true width.

The outstanding results from GDD012 are in addition to the previously reported high grade RC results (ASX release 23/01/2008) which included: 50 metres grading 494 ppm U3O8; 37 metres grading 459 ppm U3O8; and 32 metres grading 331 ppm U3O8. Hole GDD012 was collared 560 metres south of the previous best diamond core result reported (ASX release 27 Nov 2007) from hole GDD004 (86m @ 350 ppm or 0.350 kg/t) and continues to extend the mineralized zone along strike to the south.

RESOURCE MODELLING

Extract commenced a 12 month, 60,000 metre, resource definition program on the seven Ida Dome prospects in June 2007. At the end of December 2007, approximately 22,000 metres of drilling had been completed. Most of this drilling has been concentrated on Garnet Valley. All seven targets were identified in the Scoping Study release (19 October 2007), and were projected to 100 metres depth (see table below).

The Company was intending to generate a resource statement for Garnet Valley next week, based on drilling and assays completed up to mid-December 2007. However, given the significance of these recent holes, the resource model will be extended to incorporate this drill hole data which will delay completion of this maiden resource estimate. Additional assay results are also pending for Garnet Valley, and the drilling program continues.

It is expected that the original resource target of 15 m.lbs for Garnet Valley (upper range) will be exceeded after all results have been received, due to the much deeper extensions evident from the program to date.


IDA DOME Exploration Targets from Scoping Study
---------------------------------------------------------------------------
Target area        Tonnage
                     range Grade range  Grade range Grade range Metal range

Prospect          M tonnes   lb/t U3O8    kg/t U3O8    ppm U3O8   M lb U3O8
---------------------------------------------------------------------------
Garnet Valley      22 - 25   0.4 - 0.6  0.18 - 0.27   180 - 270  8.8 - 15.0
---------------------------------------------------------------------------
Hook                 3 - 4   0.4 - 0.6  0.18 - 0.27   180 - 270   1.2 - 2.4
---------------------------------------------------------------------------
Swakop West          4 - 5   0.4 - 0.6  0.18 - 0.27   180 - 270   1.6 - 3.0
---------------------------------------------------------------------------
Ida Central      5.5 - 6.5   0.4 - 0.6  0.18 - 0.27   180 - 270   2.2 - 3.9
---------------------------------------------------------------------------
Holland's Dome 10.5 - 11.5   0.7 - 0.9  0.32 - 0.41   320 - 410  7.3 - 10.3
---------------------------------------------------------------------------
Ida East         5.5 - 6.5   0.4 - 0.6  0.18 - 0.27   180 - 270   2.2 - 3.9
---------------------------------------------------------------------------
New Camp         3.5 - 4.5   0.4 - 0.6  0.18 - 0.27   180 - 270   1.4 - 2.7
---------------------------------------------------------------------------
Total              54 - 63   0.4 - 0.6  0.20 - 0.30   200 - 300 24.7 - 41.2
---------------------------------------------------------------------------

Some resource definition drilling has also been completed at the Ida Central and New Camp prospects. RC drilling has just commenced at the Hook prospect and will commence at Holland's Dome in February 2008. The current drilling programme will continue at Garnet Valley through to April/May.

The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr Martin Spivey, who is a Member of The Australasian Institute of Mining and Metallurgy and Mr Andrew Penkethman who is a Member of the Australian Institute of Geoscientists. Mr Spivey and Mr Penkethman are both full time employees of the company. Mr Spivey and Mr Penkethman have sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Spivey and Mr Penkethman consent to the inclusion in this report of the matters based on their information in the form and context in which it appears.

APPENDIX 1:

TABLE OF NEW RESULTS

Husab Uranium Project: Garnet Valley Drilling Results

Uranium intersections greater than 0.1 kg/t U3O8 over drill hole intersection widths of not less than 2 metres down hole width:


---------------------------------------------------------------------------
Hole_id  Northing Easting Azi_True   Dip   From    To  Width  Grade   Grade
              UTM     UTM     (deg) (deg)    (m)   (m)    (m)  kg/t    lb/t
            WGS84  WGS 84                                      U3O8    U3O8
              33S     33S
---------------------------------------------------------------------------
GDD0008   7483466  500889      300   -60      78   97    19   0.227   0.501
---------------------------------------------------------------------------
                                             111  128    17   0.326   0.719
---------------------------------------------------------------------------
                                             222  224     2   0.205   0.451
---------------------------------------------------------------------------
                                             259  285    26   0.140   0.308
---------------------------------------------------------------------------
GDD0012   7483353  500917      300   -60      37   39     2   0.227   0.499
---------------------------------------------------------------------------
                                             156  281   125   1.344   2.963
---------------------------------------------------------------------------
        including                            156  197    41   0.384   0.846
---------------------------------------------------------------------------
        including                            212  238    26   0.467   1.030
---------------------------------------------------------------------------
        including                            250  281    31   4.477   9.870
---------------------------------------------------------------------------
            which
         includes                            276  279     3  44.601  98.327
---------------------------------------------------------------------------

Notes:

- Analyses on half sectioned NQ (50mm) core by Genalysis Laboratory Services, Perth. Uranium assays were carried out by Four Acid Digest/MS (Method AT/MS).

- Metal values (U) have been converted to oxide values (U3O8) using a factor of 1.179, and expressed as kg/t U3O8. Note that 100 ppm U3O8 is equivalent to 0.1 kg/t U3O8, which is 0.01% U3O8.

- Assays expressed as kg/t U3O8 have been converted to lb/ tonne by multiplying by 2.2046.

- All results are from the Garnet Valley panel of the Ida Trend.

- Intersection widths are estimated to be approximately true width.

Contacts:
Extract Resources
Peter McIntyre
Managing Director
+61 (08) 9367 2111
+61 (08) 9367 2144 (FAX)

Extract Resources
Richard Henning
Investor Relations
+61 (08) 9367 2111
+61 (08) 9367 2144 (FAX)
Email: rhenning@extractresources.com
Website: www.extractresources.com

Related Stocks:
Stock Market XML and JSON Data API provided by FinancialContent Services, Inc.
Nasdaq quotes delayed at least 15 minutes, all others at least 20 minutes.
Markets are closed on certain holidays. Stock Market Holiday List
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
Press Release Service provided by PRConnect.
Stock quotes supplied by Telekurs USA
Postage Rates Bots go here